SILVERCORP REPORTS UPDATED MINERAL RESERVES AND RESOURCES AT THE GC MINE
SILVERCORP REPORTS UPDATED MINERAL RESERVES AND RESOURCES AT THE GC MINE |
| [23-June-2026] |
Trading Symbol: TSX/NYSE American: SVM VANCOUVER, BC, June 23, 2026 /PRNewswire/ - Silvercorp Metals Inc. ("Silvercorp" or the "Company") (TSX: SVM) (NYSE American: SVM) is pleased to report the results of an updated Technical Report titled Technical Report on Gaocheng Silver-Lead-Zinc Project in Guangdong Province, China for the Gaocheng Mine ("The GC 2026 Technical Report") prepared in accordance with National Instrument 43-101 ("NI 43-101") by SRK Consulting China Ltd ("SRK") with a Mineral Reserve and Mineral Resource dated effective December 31, 2025. The Gaocheng underground Ag-Pb-Zn mine ("GC Mine") is located in Guangdong Province, China. Summary of the GC 2026 Technical Report
Mineral Resources The December 31, 2025 Mineral Resources were estimated using a block modelling approach in Micromine. All grade estimation was completed using inverse distance squared. Resource estimates were made for a total of 315 mineralized vein structures for the GC Mine. The Mineral Resources are reported above cut-offs after applying a minimum practical extraction width of 0.4 m. Cut-off grades are based on in situ values in silver equivalent (AgEq) terms in grams per tonne and incorporate mining, trucking and processing costs, with metallurgical recoveries and payable values provided by Silvercorp and reviewed by the QPs. AgEq formulas are shown in the footnotes of the table below. The estimated Mineral Resources and metal content for the GC Mine as of December 31, 2025, are detailed in Table 1 below. Table 1. GC Mine Mineral Resources and metal content for Ag, Pb, and Zn as of December 31, 2025 (Inclusive of Mineral Reserves)
A comparison of Mineral Resource estimates between June 30, 2024 and December 31, 2025 for payable metals indicates the following:
Reasons for the differences in grade, tonnes, and contained metal include updated interpretation of the mineralization, conversion to higher categories arising from drilling and level development, application of different cut-off grades (COGs), and depletion due to mining. Mineral Reserves The Mineral Reserve estimation is based on the assumption that current stoping practices will continue to be predominant at the GC Mine, namely cut and fill resuing, overhand cut and fill stoping ("OCAF"), and shrinkage stoping, using hand-held drills and hand-mucking or wheelbarrows within stopes, and loading to mine cars or truck by rocker-shovel or by load-haul-dump machine ("LHD"). The largely sub-vertical veins, generally competent ground, reasonably regular vein width, and hand-mining techniques using short rounds, allows a significant degree of selectivity and control in the stoping process. Minimum mining widths of 0.5 m for resuing and 1.0 m for shrinkage and OCAF are assumed. The QP has observed the mining methods at the GC Mine and considers the minimum extraction and mining width assumptions to be reasonable. Minimum dilution assumptions are 0.10 m of total overbreak for a resuing cut, and 0.2 m of total overbreak for a shrinkage stope and OCAF stope. Mining dilution and recovery factors vary somewhat from stope to stope and with mining method. Average dilution factors have been estimated as 17% for resuing, and 25% for shrinkage and OCAF, while assumed mining recovery factors are 95% for resuing stopes, and 92% for shrinkage and OCAF stopes. For the total tonnage estimated as GC Mine Reserves and included in the life of mine plan, approximately 28% is associated with resuing-type methods and approximately 9% with OCAF, and approximately 63% with shrinkage. The estimated Mineral Reserves and metal content for the GC Mine as of December 31, 2025 are detailed in Table 2 below. Table 2. GC Mine Mineral Reserve estimates and metal content as of December 31, 2025
Total GC Mine Mineral Reserve tonnes are approximately 34% of Mineral Resource (Measured plus Indicated) tonnes. Ag, Pb, and Zn Mineral Reserve grades are 97%, 100%, and 100% respectively of the corresponding Measured plus Indicated Mineral Resource grades. Metal conversion percentages for Ag, Pb, and Zn are 33%, 34%, and 34% respectively. Some significant aspects of a comparison of Mineral Reserve estimates between June 30, 2024 (the GC 2024 Technical Report) and the GC 2026 Technical Report are the following:
The projected production profile for the GC Mine using current Mineral Reserves is shown in Table 3. Table 3. GC Mine LOM production profile
The GC 2026 Technical Report concludes that the GC Mine continues to be a strongly viable operation based on current Mineral Reserves, with potential to extend its Mineral Resources via further exploration and development, particularly in areas with identified Inferred material. Qualified Persons All lead authors of the GC Technical Report qualify as independent Qualified Persons ("QPs"). Four of the independent authors have visited the GC Mine from April 27 to 29, 2026. The QPs have examined all aspects of the project, including drill core, underground workings, processing plant and surface infrastructure. The GC 2026 Technical Report will be made available for review on the SEDAR system and on the Company's website at www.silvercorpmetals.com within 45 days of this news release. Yanfang Zhao, MAIG, MAusIMM, of SRK Consulting (China) Ltd.; Falong Hu, FAusIMM (CP), of SRK Consulting (China) Ltd.; and Guoliang Ma, P.Geo. of Silvercorp Metals Inc. are Qualified Persons as defined by NI 43-101. The Qualified Persons have reviewed and consented to this press release and believe it fairly and accurately represents the information in the GC 2026 Technical Report that supports the disclosure. About Silvercorp Silvercorp is a Canadian mining company producing silver, gold, lead, and zinc with a long history of profitability and growth potential. The Company's strategy is to create shareholder value by 1) focusing on generating free cashflow from long life mines; 2) organic growth through extensive drilling for discovery; 3) ongoing merger and acquisition efforts to unlock value; and 4) long term commitment to responsible mining and ESG. For more information, please visit our website at www.silvercorpmetals.com. For further information CAUTIONARY DISCLAIMER - FORWARD-LOOKING STATEMENTS Certain of the statements and information in this news release constitute "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian provincial securities laws (collectively, "forward-looking statements"). Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "is expected", "anticipates", "believes", "plans", "projects", "estimates", "assumes", "intends", "strategies", "targets", "goals", "forecasts", "objectives", "budgets", "schedules", "potential" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements. Forward-looking statements relate to, among other things: the price of silver and other metals; foreign exchange rates; the accuracy of mineral resource and mineral reserve estimates at the Company's material properties; the sufficiency of the Company's capital to finance the Company's operations; estimates of revenues, operation costs, capital expenditures, mine plan, and estimated production from the Company's mines; estimated mine life, potential to expand mine life and extend Mineral Resources via further exploration and development and any anticipated changes related thereto; future tailings storage facility capacity expansion; timing of receipt of permits and regulatory approvals; availability of funds from production to finance the Company's operations; and access to and availability of funding for future construction, use of proceeds from any financing and development of the Company's properties. Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those reflected in the forward-looking statements, including, without limitation, risks relating to: fluctuating commodity prices; calculation of resources, reserves and mineralization and precious and base metal recovery; interpretations and assumptions of mineral resource and mineral reserve estimates; exploration and development programs; feasibility and engineering reports; permits and licences; title to properties; property interests; joint venture partners; acquisition of commercially mineable mineral rights; financing; recent market events and conditions; economic factors affecting the Company; timing, estimated amount, capital and operating expenditures and economic returns of future production; integration of future acquisitions into the Company's existing operations; competition; operations and political conditions; regulatory environment in China, Canada, the United States, Ecuador and Kyrgyzstan; our ability to comply with environmental, health and safety laws; environmental risks; foreign exchange rate fluctuations; insurance; risks and hazards of mining operations; key personnel; conflicts of interest; dependence on management; internal control over financial reporting; and bringing actions and enforcing judgments under U.S. securities laws. This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements. Forward-looking statements are statements about the future and are inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in the Company's Annual Information Form under the heading "Risk Factors". Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated, described or intended. Accordingly, readers should not place undue reliance on forward-looking statements. The Company's forward-looking statements are based on the assumptions, beliefs, expectations and opinions of management as of the date of this news release, and other than as required by applicable securities laws, the Company does not assume any obligation to update forward-looking statements if circumstances or management's assumptions, beliefs, expectations or opinions should change, or changes in any other events affecting such statements. For the reasons set forth above, investors should not place undue reliance on forward-looking statements. CAUTIONARY NOTE TO US INVESTORS The technical and scientific information contained herein has been prepared in accordance with NI 43‐101 and the Canadian Institute of Mining, Metallurgy and Petroleum classification system, which differs significantly from the standards adopted by the U.S. Securities and Exchange Commission (the "SEC"). Accordingly, the technical and scientific information contained herein, including any estimates of mineral reserves and mineral resources, may not be comparable to similar information disclosed by U.S. companies subject to the disclosure requirements of the SEC. In particular, and without limiting the generality of the foregoing, this news release uses the terms "measured resources," "indicated resources" and "inferred resources" as defined in accordance with NI 43-101 and the CIM Standards. Further to recent amendments, mineral property disclosure requirements in the United States (the "U.S. Rules") are governed by subpart 1300 of Regulation S-K of the U.S. Securities Act of 1933, as amended (the "U.S. Securities Act") which differ from the CIM Standards. As a foreign private issuer that is eligible to file reports with the SEC pursuant to the multi-jurisdictional disclosure system (the "MJDS"), the Company is not required to provide disclosure on its mineral properties under the U.S. Rules and will continue to provide disclosure under NI 43-101 and the CIM Standards. If the Company ceases to be a foreign private issuer or loses its eligibility to file its annual report on Form 40-F pursuant to the MJDS, then the Company will be subject to the U.S. Rules, which differ from the requirements of NI 43-101 and the CIM Standards. Pursuant to the new U.S. Rules, the SEC recognizes estimates of "measured mineral resources", "indicated mineral resources" and "inferred mineral resources." In addition, the definitions of "proven mineral reserves" and "probable mineral reserves" under the U.S. Rules are now "substantially similar" to the corresponding standards under NI 43-101. Mineralization described using these terms has a greater amount of uncertainty as to its existence and feasibility than mineralization that has been characterized as reserves. Accordingly, U.S. investors are cautioned not to assume that any measured mineral resources, indicated mineral resources, or inferred mineral resources that the Company reports are or will be economically or legally mineable. Further, "inferred mineral resources" have a greater amount of uncertainty as to their existence and as to whether they can be mined legally or economically. Under Canadian securities laws, estimates of "inferred mineral resources" may not form the basis of feasibility or pre-feasibility studies, except in rare cases. While the above terms under the U.S. Rules are "substantially similar" to the standards under NI 43-101 and CIM Standards, there are differences in the definitions under the U.S. Rules and CIM Standards. Accordingly, there is no assurance any mineral reserves or mineral resources that the Company may report as "proven mineral reserves", "probable mineral reserves", "measured mineral resources", "indicated mineral resources" and "inferred mineral resources" under NI 43-101 would be the same had the Company prepared the reserve or resource estimates under the standards adopted under the U.S. Rules. Additional information relating to the Company, including Silvercorp's Annual Information Form, can be obtained under the Company's profile on SEDAR+ at www.sedarplus.ca on EDGAR at www.sec.gov, and on the Company's website at www.silvercorpmetals.com
SOURCE Silvercorp Metals Inc. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Company Codes: AMEX:SVM,Toronto:SVM,NYSE:SVM,NYSE-MKT:SVM | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||













