California American Water Completes $156,500 Wastewater Treatment Plant Upgrade at Carmel Valley Ranch
California American Water Completes $156,500 Wastewater Treatment Plant Upgrade at Carmel Valley Ranch |
| [17-March-2026] |
PACIFIC GROVE, Calif., March 17, 2026 /PRNewswire/ -- California American Water recently completed a screen replacement project at the Carmel Valley Ranch wastewater treatment plant, which will reduce energy costs and improve overall efficiency. The company has managed and operated the wastewater treatment plant since 2002, consistently implementing technology upgrades to enhance efficiency and maintain operational excellence. "The project replaced the existing effluent filters and intake screens," said Oliver Bell, Project Engineer at California American Water in Pacific Grove. "The previous screens required both more maintenance and more energy, while the improved technology increases efficiency and reduces energy needs." An important element of California American Water's wastewater treatment program includes ongoing Fats, Oils and Grease (F.O.G.) education. F.O.G. education helps to inform customers on proper disposal of household and kitchen materials to avoid disposal of improper materials down drains and into the filtering equipment, reducing the risk of clogging and system backups. About American Water About California American Water
SOURCE American Water | ||
Company Codes: NYSE:AWK |













